We shifted in on 14-Nov. 80% of unpacking completed. The remaining 20% seems harder to complete as we don't seem to have urgent needs on the stuffs which are still inside the cartons. I am wondering if we just throw them away. :p
We still need to buy study table and chair for the study room. I personally need a DVD player, preferably with Karaoke function. As the rooms are not installed with ceiling fan, we need to get standing fans too. Hopefully, all these can be settled before mid Dec. Then, we shall plan for our housewarming party around Christmas or New Year time. :)
- Posted using BlogPress from my iPhone
Friday, 26 November 2010
We have moved in!
Posted by Nonsense Queen at 11/26/2010 01:13:00 am 0 comments
Saturday, 13 November 2010
Renovation updates - furnitures
Living hall - sofa & dining table/chairs

Living hall/balcony

Dining area

Guest room

Master room

- Posted using BlogPress from my iPhone
Posted by Nonsense Queen at 11/13/2010 06:08:00 pm 0 comments
Friday, 12 November 2010
Renovation updates - glass backing cracked
During our final QC just now, we discovered a 4-inch length crack mark on the kitchen glass backing. Sigh! I really regret to heed my ID advice to add the glass backing for the kitchen cabinet.
- Posted using BlogPress from my iPhone
Posted by Nonsense Queen at 11/12/2010 04:22:00 am 0 comments
Tuesday, 9 November 2010
Renovation updates - wardrobe
Our wardrobe is Australian system. It is mounted directly to the wall, ceiling as the top and floor as the base. One of the door is 8ft height mirror panel. I guess all ladies will love it, like me. However, as darling doesn't like reflective surface in our master room, we have specially made the mirror on the inner track so that we can hide the mirror panel behind the frosted glass panel at night.
Front view - Both doors closed

Left side - drawers & shelves

Right side - hanging bars

- Posted using BlogPress from my iPhone
Posted by Nonsense Queen at 11/09/2010 01:49:00 am 0 comments
Sunday, 7 November 2010
Renovation updates - schedule delayed!
I am totally disappointed with the renovation workmanship and demand for rework from the contractors. Because of this, we got to postpone the delivery of our furnitures and electronic appliances which had been scheduled on 8-Nov. In spite of this, hubby and I still expect to move on 14-Nov as this is the only good day for moving before 20-Nov (end of my current tenancy) according to lunar calendar. Pray hard!
- Posted using BlogPress from my iPhone
Posted by Nonsense Queen at 11/07/2010 02:24:00 am 0 comments
Friday, 5 November 2010
Renovation updates - dining light
The dining light is finally installed. It doesn't look that great though.

- Posted using BlogPress from my iPhone
Posted by Nonsense Queen at 11/05/2010 01:06:00 am 0 comments
